Set just outside of Darlington Town centre, this new distribution centre development – owned by a major global online retailer – comprises of a three-level warehouse, utilising the latest robotic automation technology alongside office and welfare facilities to cater for 1,500 employees.
Specification
• Full design responsibility for the Mechanical and Electrical services.
• BIM 3D design drawings
• High Voltage Electrical Distribution
• LV Electrical Distribution
• Standby Power Generation for essential services
• External LED Lighting
• Internal LED Lighting
• Site wide power supplies
• Fire Alarm
• Renewable technologies
• Heating & Cooling utilising air source heat pumps with heat recovery technology
• Ventilation
• Airconditioning
• Natural Gas
• Plumbing
• Drainage
• Sanitaryware
• Thermal Insulation
• Automatic Controls
• Site wide building management system
Sector: Fulfilment distribution
Value: £15m
Duration: 44 weeks