UK

Major Online Retailer’s Distribution Centre, Magdeburg


Set just outside of Magdeburg city centre, this new distribution centre development is a 3 level warehouse,
comprising of pick towers, alongside office and welfare facilities to cater for the 1450 employees who will work
at the site.

Specification

• Full design responsibility for the Mechanical and Electrical services
• BIM 3D design drawings
• High Voltage Electrical Distribution
• LV Electrical Distribution
• Standby Power Generation for essential services
• External LED Lighting
• Internal LED Lighting
• Site wide power supplies
• Fire Alarm
• Renewable technologies
• Heating & Cooling utilising air source heat pumps
• with heat recovery technology
• Ventilation
• Air conditioning
• Natural Gas
• Plumbing
• Drainage
• Sanitaryware
• Thermal Insulation
• Automatic Controls
• Plumbing
• Drainage
• Sanitaryware
• Thermal Insulation
• Automatic Controls
• Site wide building management system

Sector: Fulfilment Distribution
Value: €25m
Duration: 90 weeks

Major Online Retailer’s Distribution Centre, Magdeburg