Travelodge, Chester


Chester Travelodge is located in the walled city centre of Chester. The 112 room hotel was a remodel of an existing 1980’s concrete block and beam frame commercial premises with a new fourth floor timber framed extension. MechFS worked in tight conditions with restricted access and just in time deliveries. Features include a restaurant, kitchen, reception, administration and linen areas, 2 lifts and several disabled access rooms and car parking with electric vehicle charging stations.

Specification

• Mechanical and Electrical design to RIBA stage 5
• New incoming electrical, gas and water supplies
• Electrical distribution
• Lightning and surge protection
• External Architectural LED Lighting – building perimeter and car park
• Internal LED Lighting
• IP CCTV internal and external
• EV – Electric vehicle charging point
• Mechanical Controls & Power Supplies
• BMS (Building Management System)
• MCW Tank and booster set
• Plantroom installation of gas boilers, calorifiers, pressure vessels and buffer vessels
• CHP providing LTHW and feed in tariff for generation of electricity
• LTHW pipework services – crimped copper
• AGD – Foul and rainwater drainage. UPVC pipework
• Connection of MCW, HW & waste to bathroom pods
• Sanitaryware – disabled
• Insulation & marking tapes to pipework & ductwork services
• Samsung VRV – Air-conditioning to all bedrooms, ancillary spaces & kitchen
• Ventilation – supply & extract for bedrooms, dining & kitchen
• BREEAM V good rating
• BRUKL (Design & As Build) Modelling provide EPC & DEC
• Chlorination of MCW systems and legionella risk assessments
• Testing & commissioning of all of the above services and provision of certification
• Demonstrations – operation of all M&E services to hotel staff
• Soft landings – MechFS operatives on site to assist hotel staff pre and post opening day
• Planned Preventative Maintenance
• Provision of O&M manuals for the end users

Sector: Hotel
Value: £1.3m
Duration: 30 weeks