Warehouse extension, Pavers Shoes


A new £4m distribution warehouse extension for leading footwear business Pavers Shoes located on the Northminster Business Park at Upper Poppleton, near York.

Specification

Supply, installation, testing and commissioning of:
• Mechanical and electrical design to RIBA stage 5
• New incoming electrical, gas and water supplies from the supplier’s connections
• Electrical distribution
• Lightning and surge protection
• External architectural LED lighting – building perimeter and carpark
• IP CCTV internal and external
• EV – Electric Vehicle Charging points
• Lighting controls to provide further energy savings throughout the project
• LED Lighting warehouse and offices, meeting rooms, reception, WC and ancillary spaces
• Main power distribution for forklift charging and the warehouse processes
• Small Power to the offices via bus bars installed under a raised floor and floor boxes to provide maximum flexibility in circulation spaces, reception, dining, etc…
• TV Aerial system to reception, meeting room and canteen
• Cat 6 data network
• Fire Alarms System
• Disabled Refuge System
• Door Access system main entrance and warehouse entrance
• Mechanical Controls and Power Supplies
• BMS (Building management systems
• MCW (Main Cold Water) – Tank and booster set
• Point of use water heating
• Photovoltaic system
• LTHW (Low temperature hot water) pipework services – Crimped copper
• AGD (Above Ground Drainage) – Foul and rainwater drainage – UPVC pipework.
• Insulation and marking tapes to pipework and ductwork services
• Sanitaryware supply and installation.
• Toshiba VRV – (Variable Refrigerant Volume) – Air conditioning the offices, meeting rooms
• Ventilation – supply and extract for offices and meeting rooms and extraction from the WC’s
• Warehouse heating via radiant gas with recirculation fans
• BRUKL (Design & As Build) Modelling to provide EPC & DEC
• Chlorination of MCW systems and legionella risk assessments
• Testing and commissioning of all the above services and provision of certification
• Demonstrations – operation of all M&E services to warehouse staff
• Soft landings – mechFS operatives on site after handover for warehouse staff assistance

Sector: Fulfilment Distribution
Value: £750k
Duration: 35 weeks